Australian BBR Network member, Structural Systems was engaged in the successful completion of Stage 1 of the $400 million Rouse Hill Project. 1,000 tones of bonded CONA slab post-tensioning system was shop drawn, supplied, installed, stressed and grouted within seven months. Stage 2 will include a residential and commercial sleeve around the perimeter of the Town Centre. The highest level of workforce health and safety protection measures for the work forces have been implemented, such as full-time eye protection and double eye protection when using angle grinders.