The Navia River Bridge is situated in Asturias, in northern Spain. The main characteristics of the Navia River Viaduct are the two 160 m central spans held up by two arches. Amongst the vast number of applicants, the Navia River Bridge convinced the jury because of the wide range of BBR post-tensioning systems that have been used – stay cable, internal and external prestressing (massive 42 strand tendons) and bars. In addition, BBR heavy lifting strand jacks and BBR auto-propelled robots which placed the jacks inside the deck were used. Congratulations to BBR PTE (Spain) for an excellent execution and innovation in post-tensioning.