Search

404 results:
311. Taking high speed rail to border  
Longest viaduct on this section of Spain’s AVE railway lines Spain’s AVE line from Barcelona to the French border nears completion with the construction of the 835 m long Rio Fluvià Viaduct. The…  
312. Strong and sustainable solutions for education sector  
BBR Network completes four major projects Three projects in the UK and one in Singapore admirably demonstrate the flexibility and strength that BBR Technology brings to education buildings.In…  
313. New BBR HiAm CONA brochure  
Extended range of technology - HiEx Saddle & Pin Connector We are proud to introduce, through our new BBR HiAm CONA Strand Stay Cable System brochure, an extended technology range which now features…  
314. New BBR HiAm CONA brochure  
Extended range of technology - HiEx Saddle & Pin Connector We are proud to introduce, through our new BBR HiAm CONA Strand Stay Cable System brochure, an extended technology range which now features…  
315. BBR VT CONA CMI ETA extended to 2016  
Further 5 years’ approval for proven CONA CMI internal bonded PT technology We are delighted to announce that the European Technical Approval ETA-06/0147 for our BBR VT CONA CMI internal bonded…  
316. Massive stay cable completes Sava Bridge installation  
BBR HiAm CONA stay cable system installed in only 12 months At an amazing length of almost 375 m, the final and massive BBR HiAm CONA stay cable for Belgrade’s Sava Bridge is now in place. Installed…  
317. Massive stay cable completes Sava Bridge installation  
BBR HiAm CONA stay cable system installed in only 12 months At an amazing length of almost 375 m, the final and massive BBR HiAm CONA stay cable for Belgrade’s Sava Bridge is now in place. Installed…  
318. Latest construction technology for Iraq  
BBR Network Member SPC provides CONA CMI The new BBR PT Specialist Company in Iraq, SPC, is now able to provide the very latest internationally approved BBR VT CONA CMI internal post-tensioning…  
319. Ringhals nuclear power station  
Demanding schedule Leading managers of European BBR Network members together with the management of BBR VT International visited the post-tensioning works project, using BBR tendons, at Ringhals…  
320. BBR stay cable technology supports mining operations  
Innovative use of BBR DINA/HiAm stays In an unusual and innovative operation at BHP Billiton Iron Ore’s Mount Whaleback facility in Western Australia, eight BBR stay cable have been fabricated,…  
Search results 311 until 320 of 404